El Dorado | 300kWp

Project Name:
El Dorado
Type of Project:
Service:
Engineering and Construction.
Location:
El Dorado, Argentina
Model:
Size:
300kWp
Status:
In Operation, 2020

El Dorado, 300kWp, located in El Dorado, Argentina, is a photovoltaic project connected to the distribution network of an electric cooperative. Soventix was in charge of the engineering, purchase of main equipment and construction supervision of this park. The project began operations in 2020.